Home › MTB Training and Racing Forums › Athlete Support Forum › Cat 1 XC build peak race
Tagged: plan adjustments
- This topic has 2 replies, 2 voices, and was last updated 11 years ago by
ngunton.
- AuthorPosts
- January 19, 2015 at 3:50 pm #12364
ngunton
ParticipantHi,
I am currently on the C1 XC base training and have just purchased the build peak race program which I’ll be starting soon.
I have a concern about the duration of the day 6/7 rides. The longest ride in the 12 week program is 3 hours. Last year my first race of the year took me 3:30 in the Cat 1. Though I do hope to improve significantly, I want to make sure I’m not out of gas by the end of the race this year either, which is just over a month from now. Most of my xc races are right around 3 hours, some over that time. Would you suggest adjusting the baseline of the plan and doing a little longer ride on one of the day 6 or 7 from time to time? If so where would I put the longer ride and how long should it be? Or should I just stick with what you have outlined and assume that the intensity intervals will do the job?Thanks for the help, and I hope to hear from you soon.
Nicole
- January 19, 2015 at 7:21 pm #12366
Lynda
KeymasterNicole,
You should add a 4 hour ride to the plan on day 7 weeks 3, 6 and 9. Otherwise stick to the plan.
Lynda
- AuthorPosts
- You must be logged in to reply to this topic.